Carbon News
  • Members
    • Login
      Forgot Password?
    • Not a member? Subscribe
    • Forgot Password
      Back to Login
    • Not a member? Subscribe
  • Home
  • New Zealand
    • Politics
    • Energy
    • Agriculture
    • Carbon emissions
    • Transport
    • Forestry
    • Business
  • Markets
    • Analysis
    • NZ carbon price
  • International
    • Australia
    • United States
    • China
    • Europe
    • United Kingdom
    • Canada
    • Asia
    • Pacific
    • Antarctic/Arctic
    • Africa
    • South America
    • United Nations
  • News Direct
    • Media releases
    • Climate calendar
  • About Carbon News
    • Contact us
    • Advertising
    • Subscribe
    • Service
    • Policies

Next steps on electrifying NZ

27 Aug 2024


Media release | The Government will progress a series of reforms to make it easier and cheaper to consent, build and maintain renewable electricity generation as well as electricity distribution and transmission, say RMA Reform Minister Chris Bishop and Energy Minister Simeon Brown.

“New Zealand has an exciting future powered by clean and green renewable electricity, buttressed by fossil fuels. Through electrification, we can supercharge our economy, tackle climate change, and strengthen our energy security,” Mr Brown says.

 

“Electrifying New Zealand’s economy is a key part of the Government’s plan to grow our economy and reduce emissions to achieve Net Zero 2050.

 

“The government’s Electrify NZ plan means taking advantage of New Zealand’s abundant renewable energy resources, so that our cars, buses, trains, ferries, and manufacturers are increasingly powered by wind, water, and the sun.”

 

“If we’re to achieve our ambitious goals for boosting our economy and reducing emissions, we must make fundamental changes to our planning and regulatory settings,” Mr Bishop says.

 

“New Zealand needs billions of dollars of investment in the coming years in renewable energy supply, transmission and distribution, but it simply costs too much and takes too much time to consent major infrastructure, including energy projects, in New Zealand.

 

“A 2022 study for the Infrastructure Commission by Sapere found that New Zealand infrastructure developers collectively spend $1.29 billion each year getting their projects consented and the cost of consenting has increased by 70 per cent since 2014.

 

“Over 40 percent of our current renewable generation requires reconsenting in the next 10 years, and total demand on NZ’s consenting system is expected to increase by over 40 percent by 2050.

 

“Put simply, we haven’t got a hope of improving energy security or achieving our climate goals with our current planning system.

 

“To give a practical example of how the RMA currently operates, in 2003 the Te Apiti windfarm site took 77 days to consent and had 20 conditions attached to that consent. In contrast, the Mill Creek windfarm site, completed in 2014, took 1,437 days, and had 90 conditions attached. This is unacceptable if we want to take renewables seriously.

 

“Even renewing consents for existing renewable power assets takes far too long. Hearings and appeals to reconsent the Clyde and Roxburgh dams, and Wairakei, ran from 2001 to 2007. It took 18 years to re-consent the Raetihi hydro dam - and when that consent was finally renewed, the number of consent conditions had increased from 4 to 136.

 

“Paperwork has taken priority over prosperity in New Zealand, and the government is taking action.”

 

The Government’s Electrify NZ plan involves:

1. Establishing a one-stop-shop fast track approvals and permitting regime

 

The Fast-track Approvals Bill is currently before the Environment Select Committee and is expected to become law before the end of the year. Once law, the one-stop-shop regime will provide a pathway for major renewable energy and transmission projects to be consented sooner and more efficiently.

 

Nearly one in five projects that have been applied to be listed in the Fast Track Approvals Bill are renewable energy projects, indicating a strong level of interest.

 

2. Amendments to the RMA to speed up resource consenting

 

The government has agreed to legislate to reduce consent and re-consenting processing time for most renewable energy consents to be within 1 year, as well as extending the default lapse periods for renewable energy, transmission and local electricity lines consents from 5 years to 10 years.

 

We also intend to increase the default consent duration to 35 years for renewable energy consents.

 

These changes will be advanced through the government’s second Resource Management Amendment Bill, to be introduced later in the year as part of the RMA Reform Phase Two.

 

3. Stronger national direction for renewable energy

 

The government is progressing changes to make it easier for national direction instruments under the RMA to be amended (through the first Resource Management Amendment Bill, currently before select committee). Once passed into law, the government will:

 

  • Amend the National Policy Statements for Renewable Electricity Generation and Electricity Transmission so they are far more directive and enabling of renewable electricity and transmission.

  • Develop further national direction to help enable a range of energy and infrastructure projects – including a new NPS-Infrastructure, and subsequent standards for different types of energy generation and infrastructure.

4. A new regime for offshore wind

 

The Government will introduce a Bill to enable a regime for offshore renewable energy to be in place by mid-2025 with the aim of opening a first feasibility permit round in late 2025. This regime will give developers greater confidence and certainty to invest and will enable the selection of developments that will deliver the most benefit for New Zealand. We are releasing decisions on the design of the regime today.

 

5. Updated regulatory settings for electricity networks and new connections

 

A range of work is underway by the Commerce Commission and the Electricity Authority to update a variety of regulatory settings so that New Zealand’s system can cope with the economy-wide shift to electrification – including supporting the Government’s goal to supercharge EV infrastructure.

print this story


More >
Media releases
More >

New look for New Zealand’s bioeconomy research

Wed 3 Sep 2025

Media release | The Bioeconomy Science Institute, Aotearoa New Zealand’s largest research organisation, launched its new look.

Jonathan Young, Ara Ake Head of Industry and Government Engagement

Conference to tackle energy hardship and build resilience returns for third year

Tue 2 Sep 2025

Media release - Ara Ake | The Energy Resilience and Affordability Conference will return on 8-9 October 2025 at the Harbourside Function Centre, Wellington, bringing together leaders from across Aotearoa New Zealand’s energy, community and research sectors.

Tasman flood waste recovery receives $2M boost

Mon 1 Sep 2025

Media release - New Zealand Government | The Government has granted Tasman District Council up to $2 million to support the region’s recovery from the severe flooding this winter, Environment Minister Penny Simmonds says.

Haukapuanui Vercoe at the 2025 Esri User Conference in San Diego, US.

Marae resilience research takes global stage

Fri 29 Aug 2025

Media release | University of Auckland - Waipapa Taumata Rau | Marae are central hubs for whānau, hapū, and iwi across Aotearoa New Zealand.

Contact and bp charge partner to offer savings on EV charging

28 Aug 2025

Media release | Contact Energy (Contact) and bp charge have partnered to introduce a new customer offer to make electric vehicle (EV) charging easier for Kiwi drivers.

Rising cost of insurance prompts call for action on affordability and climate risks

27 Aug 2025

Media release | Consumer NZ releases a sobering report that highlights how house insurance is becoming increasingly out of reach for New Zealanders.

East Coast schools receive funding as part of pool solar project

26 Aug 2025

Media release: Trust Tairāwhiti | Four schools along the East Coast have been equipped with solar panels, battery storage, and pool heating systems as part of a $3.5m school pool heating and resilience project.

Verra and S&P advance carbon market integration with next-generation registry

26 Aug 2025

Media release - Verra | World’s largest GHG standards body collaborates with the world’s leading commodities information and registry infrastructure provider.

PhD student William Sheard says mining e-waste is more sustainable than mining the earth for metals.

The quest to turn e-waste into metals

26 Aug 2025

Media release – University of Auckland | William Sheard is on a quest to turn electronic waste into metals.

Latest data confirms rail as lower carbon option for moving freight

25 Aug 2025

Media release | KiwiRail customers who chose to move their goods on rail collectively saved 220,254 tonnes of CO2e emissions in the last financial year (ending June 2025).

Carbon News

Subscriptions, Advertising & General

[email protected]

Editorial

[email protected]

We welcome comments, news tips and suggestions - please also use this address to submit all media releases for News Direct).

Useful Links
Home About Carbon News Contact us Advertising Subscribe Service Policies
New Zealand
Politics Energy Agriculture Carbon emissions Transport Forestry Business
International
Australia United States China Europe United Kingdom Canada Asia Pacific Antarctic/Arctic Africa South America United Nations
Home
Markets
Analysis NZ carbon price
News Direct
Media releases Climate calendar

© 2008-2025 Carbon News. All Rights Reserved. • Your IP Address: 216.73.216.185 • User account: Sign In

Please wait...
Audit log: